Boiler Installation Dublin Area
Problem
Upon checking the boiler during a breakdown. It became apparant that all the boiler tubes would need to be changed. The client had a tight budget so we looked for another alternative.
Solution
We decided to install a refurbished boiler which met the clients specification. This proved to be the most cost effective option.
Burner Summary
| Rating: | 5000 KG/HR |
| Fuel: | Dual Fuel, Oil & Gas Fired |
| Manufacturer: | Robey |
| Working Pressure: | 11 Bar G |
| Operation: | N/A |
| Year: | 2000 |